Difference between revisions of "Battery backup"
From Yantrr Wiki
Line 1: | Line 1: | ||
VIBE2 provides an optional battery circuit for standby purposes. | VIBE2 provides an optional battery circuit for standby purposes. | ||
− | == | + | ==Instructions== |
A 2-pin Connector interface is provided at battery test points TP6 and TP8, with a 10K thermistor R31 mounted on PCB to simulate the thermistor circuit for battery charging. | A 2-pin Connector interface is provided at battery test points TP6 and TP8, with a 10K thermistor R31 mounted on PCB to simulate the thermistor circuit for battery charging. |
Latest revision as of 04:28, 12 July 2016
VIBE2 provides an optional battery circuit for standby purposes.
Instructions
A 2-pin Connector interface is provided at battery test points TP6 and TP8, with a 10K thermistor R31 mounted on PCB to simulate the thermistor circuit for battery charging.
Following is a diagram explaining the battery interfaces on VIBE2 :
Follow the given steps to change the battery charging conditions :
- Connect a 3.7V Li-Po battery of sufficient capacity with its VBAT to TP6 and GND to TP8.
- Issue the following commands in console :
a) Change battery charging range to 0-60 degree C
# i2cset -f -y 0 0X24 6 0Xb3 b
b) Change battery charging voltage to 4.2V
# i2cset -f -y 0 0X24 5 0Xa0 b
NOTE: When board is powered up only by battery then Power switch S3 has to be pressed to turn it on.
Please refer to image provided below for battery connections